Description of works:
  • Full design and construction (D&C) of fire suppression and detection systems to meeting Authority having Jurisdiction (AHJ), the Fire Engineered Solution and all relevant codes
  • System design using AutoCAD 2008 in accordance with BCA Section C, E and referenced Australian Standards.
  • Liaison  with Builder Fire Engineer, Consultants, NSW Fire Brigade and Owner
  • Hydraulic design and calculations using AutoHyena V6.00.2.
  • 1 Sprinkler control valve set.
  • Sprinkler system in warehouse area installed as High Piled Storage design to AS2118 Extra High Hazard requirements and Factory Mutual Data sheets
  • Sprinkler system in offices installed to AS2118 ‘Light Hazard’ requirements.
  • Automatic Fire Detection and Alarm System Installed to AS1670.1 & AS4428.1.

EWIS system AS1670.4, AS4428.4

  • Client   Mount Arthur Mine
  • Storeys  2
  • System Type  High pile storage protection
  • Duration  3 months
  • Class of Building  7 – Warehouse, 5 – Offices
  • Approx Floor Area 9,000m2
  • Effective Height  11m